Skip to content

Metacenter OpsLog

Log over changes and events on national e-infrastructure. email: support@metacenter.no.

  • Operations Log
  • Contact
  • About
  • Documentation
  • RSS
  • Twitter
  • Documentation
  • Email

Search

Categories

  • Announcement (179)
  • Downtime (37)
  • File system (50)
  • Hardware (13)
  • Queue (12)
  • Scheduled Maintenance (25)
  • Software (1)
  • Upgrade (5)

Metacenter OpsLog

This is the Metacenter operations log with announcements for the national e-infrastructure resources.

Tags

  • Application Managment (1)
  • Betzy (6)
  • Chemistry (1)
  • cooling (1)
  • downtime (10)
  • File system (3)
  • Fram (92)
  • infiniband (2)
  • Install (1)
  • Lustre (1)
  • maintenance (2)
  • Material Science (2)
  • MDS (1)
  • network (1)
  • NIRD (40)
  • NIRD Toolkit (7)
  • Saga (23)
  • Service Platform (17)
  • Software (2)
  • srun (1)
  • Stallo (8)
  • Stallomigration (1)
  • storage (1)
  • VASP (2)
  • Vilje (8)

Stallo downtime February 1st. continue.

The electical work have met unforseen problems, one aggregate will not power on. They need to continue the work further into this evening.

Posted on February 1, 2019February 1, 2019Author Steinar Trædal-HendenCategories Announcement

Post navigation

Previous Previous post: Unstable NIRD connection
Next Next post: Stallo up again!
Proudly powered by WordPress